Foundation with steel reinforced micro piles
Drilling Rig
KLEMM KR 709-3G
Customer
Southern Piling Ltd.
Place
Wellingborough, England
Drilling Job
Soil stabilization using ø 300 mm vertical micro piles into clay for construction of apartments at Henshaw Road
Drilling Method
Rotary drilling with SFA hollow stem augers
Results
200 pcs. of vertical micro piles with ø 300 mm and up to 17 m of depth
Period: 1 week
Equipment
- KLEMM Drilling Rig KR 709-3G
- Rotary head type KH 62
- Drill mast type 303/13 (length 10500 mm)


